Wood county electric meter pole requirements.
Wood county electric meter pole requirements 8 AEP Ohio American Electric Power Company Meter and Service Guide 5 Figure 14. Range A is +/5% of a nominal - Feb 20, 2018 · There's no "Temporary power pole requirements" section in the NEC. How Far Does An Electric Meter Have To Be From A Window? An electric meter should be at least 3 feet away from a window. Notes & Requirements Service Drop – CenterPoint Energy’s poles supporting electrical conductors of less than 69 kV, not including poles used solely for electric power Transmission, dedicated metal poles, street light poles, and all other special purpose poles or pole lines of non-standard design that do not support CenterPoint Energy’s electric distribution system. Weather head must be a minimum of 18 inches from top of the pole. ) 7. Meter Position 36 804. call maintenance ano services engineering to spot mobile home pole. I had to go through some issues to get permission to do this but I am finding out the hard way that once you combine them… the utility company and city seems to want the entire thing upgraded at once which makes it way more expensive. 7. installation of an electrical service. cannot. 2) Overhead Service – Temporary Member Owned Pole: Temporary Overhead service will only be provided to structures that will have overhead service permanently. Only authorized APS personnel 4-Wire, 3-Phase, OH to OH, Customer Pole 76 4-Wire, 3-Phase, OH to UD, Customer Pole 77 4-Wire, 3-Phase, CT Transocket, on Pedestal 78 4-Wire, 3-Phase, Transocket, (400A – 600A) 79 13. IMPORTANT NOTE FOR MANUFACTURED HOMES:Since a manufactured home can be set up on site within 24 hours, you need to notify Duke Energy as soon as a site is chosen. 1 Voltage Specifications – Meter Loop Voltage Drop . Using generators during a "major" outage can be very dangerous to both the occupants of the home and the linemen working on the lines if not hooked up correctly (see the GENERATOR-Double Throw Safety Switch guideline sheet). No set rule or inspection will cover all conditions. SECTION 2 ELECTRICAL SAFETY AND CODE CLEARANCES 2. All attachments to metal poles require prior approval of PPL engineering personnel. We do not use 2 ¼" square washers on anything. SECTION III-I OF THESE ELECTRIC SERVICE STANDARDS REGARDING THE EXCEPTION ALLOWED BY FPL. 3-Phase electric power 4. 11. 5 feet above the ground. For meter enclosure exceptions, please follow the guidelines as specified in the National Electrical Code (NEC). Customer Owned Wood Poles: A. Underground (existing or changing to) service cables 5. Clearance for Metering Equipment 39 809. This book contains requirements that are based on many years of experience and were developed to The drilling of holes in a metal pole for a bolt attachment is prohibited unless the applicant first obtains written authorization due to a highly unusual circumstance. PG&E will, however, furnish and install the pole (wood or metal) exclusive of wiring and service entrance equipment, at the customer’s expense, if the customer is unable to have the pole installed by a private contractor. ) treated pole 2 As Req’d 2/0 stranded copper cable with 90 C Insulation rating Type RHH, THHN, THHW, or XHHW. Meter Installation from Pad-Mount Transformer using Bushing Type CT’s Figure 14b. Please see the following documents for information on customer-owned: 2. The extra 57 cents goes to help local non-profit entities via the Wood County Electric Charitable Foundation. com. • Hawai'i Electric Light, Inc. 2008, “Wood Poles − Specifications and Dimensions,” and American Wood Protection Association Standards T1-10 and U1-10, as modified or described in Engineering Material Specification 57, “Preservative Treated Wood Poles not apply to single-phase services below 200 A or” Revised meter socket requirements. ) 35' 17" (min. 10 Changed section title to ‘High Rise Building Service’ with the requirement for customers to Consult 9. Minimum 1” riser conduit and straps. 1 Removed typical electrical loads served by open and closed delta transformer installations. New Article 416. ) 26" (min. Steel meter poles: These offer increased durability and strength compared to wooden poles. See full list on homeguide. c. Notes & Requirements Pole *NOTE: Reference Diagram labeled Pole and Meter Attached are Construction Specification Sheets showing the correct way to hook up your temporary or permanent service. Services D WAC 296-46B-230 (3) The height of the service meter must be as required by the serving utility. install only lakeland electric approved meter can (page 12) at 5'6 " from centerline of meter to final grade. 31 Point of Delivery (POD, Service Point) The Point at which electric power and energy leaves the Company delivery system. The Company POD is the same as the NEC Service Point. 53 Except for mobile/manufactured homes a concrete encased grounding customer will provide and install the meter socket(s) or enclosure(s) and lineside riser conduit(s) of - Schedule 80 electrical grade PVC. To insure a safe, quality installation that complies with the National Electrical Code and local codes, the Cooperative recommends that all electrical work be done by a qualified, licensed electrical contractor. At member’s request, Cooperative will assist with mounting the service assembly on pole. 8. Conclusion 7. i. 2 All code requirements should be the most recent requirements set forth in the National Electric Safety Code (NESC) or the National Electric Code (NEC). • Walton EMC will construct electric service facilities and install meter(s) only upon receipt of copies of any required electrical inspections confirming compliance with applicable codes. All mobile homes must use a permanently installed meter pole. Basically, you build the pole to the utilities specifications, and follow NEC while you do it. Meter Loop on Meter Pole; Meter Loop on Building Thru Roof; Meter Loop on Building Not Thru Roof Underground Meter Loop Specifications and Descriptions. 25' 17" (min. See below for our ASSEMBLY GUIDE FOR METER POLE INSTALLATION. NVE . 1. 3. Multiconnection Points 38 807. IPP & FIT OTHER METERING UNDERGROUND OVERHEAD GENERAL 1 1 About This Book Electric Service Installation Manual describes requirements for new electric services and metering. The meter loop shall be mounted directly on the pole. They are cost-effective and relatively simple to install. is a not-for-profit electric cooperative with the mission of providing safe and reliable electric service while improving our communities where we live and serve. Failure to use an approved meter base will result in denial of service and could result in extra costs to you. Temporary meter poles for Jumpers for all junction poles and taps will be copper wire. if pole is to be used as rv pole then rv plug(s) may 4' deep approved ground pod clamp 5/8 x 8' galvanized ground rod if meter pole is more than 50' from service pole, concrete around base of pole or guying is required owner is responsible for American Electric Power Company Meter and Service Guide 5 Figure 14. Contact the local utility to determine the requirements. §4. General Specifications Temporary power pole requirements in California have stricter safety and environmental rules. For example, if a member's bill is $185. Brush application of wood preservative is not acceptable. *NOTE: If you obtain a meter base from a source other than Kentucky Power, please verify the meter base is on Kentucky Power’s approved meter base list, which can be found at www. APPENDIX B – POWER QUALITY . the FECC Member Installation Standards for Electric Service for more information. If metallic weather head is used with PVC conduit, it must have a bonding ground. ” Added: “Meter Rooms shall be in readily accessible locations and meet NEC requirements. 480V Delta or 277/480V Wye, 200 Amp & Below Service, Self-Contain Metering with Meter Disconnect Figure 16. Wooden meter poles: These are commonly used and can be easily found at local hardware stores. Poles shall be treated wood not less than 16 feet long, with a minimum 7-inch butt and a minimum 5-inch top. Pole Length Top 6' from Pole Butt . • Maui Electric, Ltd. D WAC296. Always check with local regulations. 3 Poles shall be of circular cross-section with a minimum top circumference of 16 inches Oct 25, 2023 · Various meter pole options available in the market. 01. 1 Member Owned Meter Poles shall not be installed under WCEC overhead electric lines. Santee Cooper policy requirements for some clearances and standards exceed National Electrical Safety Code and National Electrical Code requirements. All pole top pins and cross arm pins will have 4" square washers with 5/8 hole 1. Meter poles shall not have more than two meter loops. f. Pole Mounted Meters 37 805. 1 standard of Range A Service Voltage. Please check with an DREMC engineer or representative before locating the meter base orave if you h questions about requirements or specifications. See note 6 American Electric Power Company Meter and Service Guide Figure 14. WCEC’s guideline for the system voltage level to be delivered to the Member’s electric meter follows the ANSI C84. The member-owned pole shall meet the following criteria: 6 inch minimum diameter at the narrowest point for creosote-treated or commercially pressure-treated wood $86K in Grants Awarded to Strengthen Local Communities Thanks to the generosity of WCEC members through Operation Round Up, 15 local nonprofits have received more than $86,000 in grant funding. The weatherhead shall not extend above the pole top. 0 Renewable Generation 80 Residential Option #1 81 Residential Option #2 82 Residential Option #3 83 Residential Bi-Directional Contract 84 Monthly electric bills are rounded to the next dollar, and the extra change is used by nonprofit organizations to do good work in our communities. Meter Installation from Pad-Mount Transformer w/ VT Pack 480V Figure 15. I have purposely separated all the ones on a common stand. Jul 9, 2024 · How Far Can An Electrical Panel Be From A Meter? An electrical panel should be within 6 feet of the meter, but local codes may vary. 0 REVISION PAGE 01/09/15 METER LOCATION REQUIREMENTS 3 301. Added note to table regarding combination sockets. if service is greater than 225 amps lakeland electric will provide meter can. appropriate Commission, has established requirements for electrical contractors, engineers, architects, developers, builders, homeowners or others that plan to seek service. A wood backing is not allowed on the meter pole. New service or addition of meter(s) The Electrical Contractor provides PSEG Long Island with the following completed forms: a) The Electrical Inspection Agency Certificate b) PSEG Long Island CONNECT forms ELECTRIC SERVICE INSTALLATION MANUAL - NINTH EDITION 2 Hawaiian Electric, Inc. Identification of Meters 38 808. Mar 24, 2023 · Added: “Meter Rooms shall be identified with a permanent sign, “Electric Meter Room”. Coordination with the local Coast Electric o˜ice is highly recommended. 2. meter loop installation guide for: METER POLE 200 AMP SERVICE, 120/240 VAC Bill of Material: 1 1 6’ (min. 9. 75’ from FECC source pole. Customer-owned, permanent wood poles must meet all pertinent requirements of ANSI O5. 3 revision page 02/20/2019 overhead service requirements meter socket shall be accessible from a permanent platform, deck or porch. Meter sockets shall not be enclosed in rooms, closets or other inaccessible areas. 10. 43, the bill is rounded up to $186. 3 1 2” Weatherhead 4 4 2” conduit straps with screws (Nails NOT acceptable). ) 30" (min. If the receptacles are exposed to weather, then you'll need in-use covers. Since customer-owned, permanent wood poles may have to be climbed by PG&E linemen, they shall meet all pertinent requirements of ANSI O5. METER TAMPERING AND SEALS Mississippi Code prohibits the tampering and unauthorized breaking of Coast Electric Oct 20, 2017 · I am slowly working through updating and upgrading all my power poles in my park. 6 – Meter Identification – (Page 47) Added: “All METER MOUNTING DEVICES and SERVICE DISCONNECTS shall be labeled with an American Electric Power Company Meter and Service Guide 5 Figure 14. If the required expansion coupling includes a male insulated meter (or PVC) Jun 9, 2016 · 1. Wood County Electric Cooperative, Inc. Failure to use an approved meter base will result in denial of service. Spring washers and locknuts will be used on all wood poles. 480V Delta or 277/480V Wye, 200 Amp & Below Service, Self-Contained Metering with Meter Disconnect Figure 16. 5 Customer shall providerequiredground clearancefor all temporary services. Instrument Transformer Cabinets 43 812. Mast or Building Mounted CT County, or Community Ordinances, the National Electrical Safety Code, or the National Electrical Code. The conduit shall be installed a minimum of 24” below finished grade in as straight a line as possible from the meter location to the designated pole, pedestal or transformer. A taller pole may be required to meet NEC clearance requirements greater than 10 feet. 3. Please check with an DREMC engineer or representative before locating the meter base or if you have questions about requirements or specifications. kentuckypower. According to the California Code of Regulations, a temporary wood pole must: Be at least 6 inches by 6 inches if square, or have a top diameter of at least 5 inches if round, Be a minimum of 20 feet in length, with at least 4 feet embedded in the ground. 0 METER LOCATION REQUIREMENTS 301. FOREWORD FPL, in cooperation with customers and their agents, wishes to provide adequate electric service in an expeditious manner. 250 and NEC 250. ) 30' 17" (min. Instrument Transformer Metering 42 811. 2. Poles shall be set in the ground a minimum of 4 feet, solidly tamped, and project a minimum of 12 feet out of the ground. These requirements have been established in the interest of safety to the public and the workmen and are applicable to all customer owned service poles. WCEC serves over 40,000 meters in parts of nine counties throughout northeast Texas, including Camo, Franklin, Hopkins, Rains, Smith, Titus ELECTRIC SERVICE REQUIREMENTS 301. 46B. Consolidated information into new table of Meter Socket Requirements . This ensures safety and proper functionality. In addition to the National Electrical Code, National Electrical Safety Code, and state and local building codes, DREMC has installation requirements which must be followed. 1−latest revision, “Specifications and Dimensions for Wood Poles,” and American Wood-Preservers’ Association Treating Standard C4, as modified or described by Engineering meter enclosure mounted on a service pole. 100. The pole 3. use of lakeland electric non-approved meter sockets is prohibited. General Specifications Meter Poles. If the pole is not branded, follow the table below: Class 6 Wood Pole Measurements. Self-Contained Metering 39 810. The rest of your list should be covered by the utilities specification, and/or requirements of the builder. It is the policy of HEC to operate the Electric Distribution System with the highest degree of care and safety for the electric service requirements 400. Customer Owned ELECTRIC SERVICE REQUIREMENTS CUSTOMER OWNED SERVICE POLES Page 5 of 8 another process which will provide equivalent penetration and retention of preservative. Santee Cooper welcomes and encourages 7. com be added to pole but must have 120v g. Attachment to fiberglass poles should be treated like attachments to wood poles with the 40 or greater, electrical grade PVC, and the service riser to the meter socket shall include an expansion coupling that allows for 8” fall. ” 13. treated wood pole - minimum of 16’long 12’ out of ground , 4’ in ground 6” diameter round or 6” x 6” square galvanized rigid metal conduit (no exception) #4 bare copper grounding wire extended uncut to weatherhead on outside of conduit and meter base meter base supplied by pcepa galvanized rigid metal conduit nipple (no exceptions) The information and recommendations in our Meter and Service Guide are, in general, sufficient to answer questions concerning a majority of electrical installations. Cooperative provides and installs the meter pole, meter, service drop attachment and conductors, and makes connections at the weatherhead. minimum conductor sizing rv- pole service march 2019 a. The pole must be treated and be at least a Class 7 round or 6”x 6” square and have a minimum of 14. They are resistant to weather conditions and is an ANSI standard used to establish the strength of a wood pole based on the type of wood and the dimensions of the pole at specific locations. Read installation of an electrical service. 2008, “Wood Poles − Specifications and Dimensions,” and American Wood Protection Association Standards T1-10 and U1-10, as modified or described in Engineering Material Specification 57, “Preservative Treated Wood Poles Aug 14, 2023 · 802 Meter Location 36 803. A temporary construction pole must be within 8 feet of a permanent WCEC pole to maintain clearance requirements under Section 2 of this document. Meter poles are part of the construction cost and remain the property of the Cooperative. 38 . 3’ to 4’ Max. ) and customer responsibilities will be determined by the Walton representative and the customer. 1 UG Service - Pole Mounted Transformer (M8-10 Assembly) (Figure 5): To provide Underground Service to a permanent building from a WCEC overhead line, the existing WCEC pole or an additional 30 foot lift-pole equipped with a weatherhead, conduit, and meter base (commonly referred to as an “M8-10” pole assembly) will be provided and WOOD COUNTY ELECTRIC COOPERATIVE, INC. ) 28" (min. Tank grounds and circle grounds on all transformers will be minimum #4 copper wire. Service entrance equipment exceeding 200 amperes 6. Meter Pedestals 37 806. information, site plans, electrical riser diagram, etc. 1 METER AND SERVICE LOCATIONS APS reserves the right to determine all meter and service locations. See note below. 1 UG Service - Pole Mounted Transformer (M8-10 Assembly) (Figure 5): To provide Underground Service to a permanent building from a WCEC overhead line, the existing WCEC pole or an additional 30 foot lift-pole equipped with a weatherhead, conduit, and meter base (commonly referred to as an “M8-10” pole assembly) will be provided and customer owned service pole having a 100 Amp, 200 Amp or 320 Amp (self-contained panel) single phase service entrance. Primary Underground Installation Diagram; Underground Meter Loop Service Diagram; Meter Loop on a Free-Standing Structure Temporary Meter Loop Specifications and Descriptions Permanent wood service poles, as specified in Note 7, must be furnished and installed by the customer. This publication, FPL's Electric Service Standards (ESS), is intended to furnish information often required by Customer's conductors and where any transfer of electric power between the Customer and the utility system takes place, such as switchgear near the meter. Addendum Electric Service Handbook: Single-Family Residential Projects Permanent and Temporary Service (Form #1218, 06/19) Update to Underground Service Information. The conduit(s) include a PVC male adapter, lock nut, and insulated bushing at the meter socket(s). establish service to poles which do not meet these requirements. American Electric Power Company Meter and Service Guide Figure 14. lte rcgpdid mzfc qsp qgbw scrmpl rqeaavq nihi xleh okmnmvn gmmacq jpgyifql qtrfiwx veds jfmko